Tide Light Rail
Encyclopedia
The Tide is a 7.4 mi light rail
Light rail
Light rail or light rail transit is a form of urban rail public transportation that generally has a lower capacity and lower speed than heavy rail and metro systems, but higher capacity and higher speed than traditional street-running tram systems...

 line in Norfolk, Virginia
Norfolk, Virginia
Norfolk is an independent city in the Commonwealth of Virginia in the United States. With a population of 242,803 as of the 2010 Census, it is Virginia's second-largest city behind neighboring Virginia Beach....

, connecting Eastern Virginia Medical School
Eastern Virginia Medical School
Eastern Virginia Medical School commonly referred to as EVMS, in Norfolk, Virginia is a public-private medical school founded by the citizens of Hampton Roads, Virginia...

, Norfolk State University
Norfolk State University
Norfolk State University is a four-year, state-supported, coed, liberal arts, historically black university located in Norfolk, Virginia. It is member school of the Thurgood Marshall Scholarship Fund and the Virginia High-Tech Partnership.-Academics:...

, and Newtown Road. Service began on August 19, 2011.

As the first light rail system in Virginia
Virginia
The Commonwealth of Virginia , is a U.S. state on the Atlantic Coast of the Southern United States. Virginia is nicknamed the "Old Dominion" and sometimes the "Mother of Presidents" after the eight U.S. presidents born there...

, the Tide is operated by Hampton Roads Transit
Hampton Roads Transit
Hampton Roads Transit a.k.a. "HRT" formed in October 1999 by the voluntary merging of PENTRAN on the Virginia Peninsula and TRT Hampton Roads Transit a.k.a. "HRT" formed in October 1999 by the voluntary merging of PENTRAN (Peninsula Transportation District Commission) on the Virginia Peninsula and...

 (HRT). Fares match local bus fares and the line accepts HRT's GO Passes.

Daily ridership in 2011 is projected at 2,900 passengers. The $318 million system is estimated to cost $6.2 million a year to operate.

The line was initially planned to open in January 2010, but cost overrun
Cost overrun
A cost overrun, also known as a cost increase or budget overrun, is an unexpected cost incurred in excess of a budgeted amount due to an under-estimation of the actual cost during budgeting...

s and extended testing of trains and electronic signage forced three delays.

History

In November 1999, the City of Virginia Beach conducted a referendum regarding the construction and operation of light rail into Virginia Beach along the Norfolk Southern railroad right-of-way. The proposed route would connect downtown Norfolk to the Virginia Beach oceanfront. The referendum led to a community discussion of the proposed light rail and feeder bus system. Local media and many special interest groups debated the matter in great detail, using information provided by a DEIS (Draft Environmental impact statement
Environmental impact statement
An environmental impact statement , under United States environmental law, is a document required by the National Environmental Policy Act for certain actions "significantly affecting the quality of the human environment". An EIS is a tool for decision making...

). The voters of Virginia Beach rejected the proposed light rail system. The Virginia Beach City Council then passed a 10-year resolution declaring that the city would no longer have any future involvement in the proposed light rail line. Years later, a major economic and development hub has been built along the Norfolk Southern rail corridor, known as the Virginia Beach Town Center
Virginia Beach Town Center
Virginia Beach Town Center is a group of offices, hotels, stores, and restaurants in Virginia Beach, Virginia.-Location:The Virginia Beach Town Center is located in the Central Business District of Virginia Beach across the street from Pembroke Mall...

. The new Town Center, along with record high gas prices in 2008, has now stirred up a renewed public interest in light rail which can now easily connect to the current rail line being constructed in Norfolk. A new referendum on light rail will not necessarily be needed in Virginia Beach due to the 10-year expiration of the previous referendum.

Since then, the City of Virginia Beach agreed to purchase the portion of the former Norfolk & Southern Railway right-of-way within Virginia Beach from Norfolk Southern. This line extends from the Norfolk/Virginia Beach boundary (near the end of the light rail line in Norfolk), continuing almost due east through the Pembroke Town Center area to Birdneck Road, ending very near the Oceanfront area of the resort city. However, no firm plans (e.g. for LRT, Bus Rapid Transit, or other uses) have been announced for the purchased right-of-way. Public transit advocates generally like the move.

After Virginia Beach
Virginia Beach, Virginia
Virginia Beach is an independent city located in the Hampton Roads metropolitan area of Virginia, on the Atlantic Ocean at the mouth of the Chesapeake Bay...

 pulled out of a proposal that would have seen the construction of a light rail line connecting Downtown Norfolk with the Virginia Beach oceanfront in 1999, Norfolk began developing a network that would be constructed entirely within its city limits.

Beginning in 2000, HRT and federal transit officials worked to create a plan that would attract federal funding. On September 22, 2006, the Federal Transit Administration
Federal Transit Administration
The Federal Transit Administration is an agency within the United States Department of Transportation that provides financial and technical assistance to local public transit systems. The FTA is one of ten modal administrations within the DOT...

 announced that the proposal met federal criteria for design, and would receive funding for a final design. On October 1, 2007, the FTA signed the agreement to appropriate $128 million for the construction of the network. The remainder of the project will be divided three ways, with the city of Norfolk contributing $33 million, the Commonwealth of Virginia contributing $31.9 million, and $39.2 million being contributed from other federal sources.

Officials announced in June 2007 that the system would be called The Tide, a name that beat out other proposed names, including Bay Runner, First Rail, Dash, Bay Breeze, Sail and Shore Line.

The trains generally run every 15 minutes; they run every 10 minutes during peak periods and every 30 minutes during early weekend mornings and late evenings. Service will be from 6:00 a.m. through 10 p.m Monday-Thursday, 6:00 a.m. through midnight on Friday-Saturday, 7:00 a.m through 9:00 p.m. on Sundays, and 9:00 a.m. through 9:00 p.m. on Holidays.

On 21 June 2011, HRTs announced the line would open on 19 August initially with demonstration rides followed by regular service beginning on 22 August. Due to high ridership during the initial demonstration period, estimated at over 46,000 riders, the demonstration period was extended, with regular service to begin on 28 August.

On 21 September 2011, Hampton Roads Transit announced the introduction of online ticketing and onboard WiFi to The Tide.

Financing

The line was primarily financed by a $232 million grant from the Federal Transit Administration approved in October 2007. Additional federal funding came from a $32.8 million grant from the American Recovery and Reinvestment Act. The final cost of the project was estimated to be $318.5 million, $106 million over the original estimate. Nevertheless, according to Norfolk mayor Paul Fraim, at a per-mile cost of less than $27 million per kilometer, The Tide ended up as if "not the lowest on a per-mile basis of any light rail, [...] at the very bottom of the list."

Rolling stock

In September 2007, HRT’s commission voted to purchase nine Siemens-built S70 vehicles, similar to those currently in operation for the LYNX Blue Line
LYNX Rapid Transit Services
Lynx Rapid Transit Services comprises a light rail line serviced by the Charlotte Area Transit System in Charlotte, North Carolina, United States...

 in Charlotte, North Carolina
Charlotte, North Carolina
Charlotte is the largest city in the U.S. state of North Carolina and the seat of Mecklenburg County. In 2010, Charlotte's population according to the US Census Bureau was 731,424, making it the 17th largest city in the United States based on population. The Charlotte metropolitan area had a 2009...

. These vehicles will form The Tide's initial fleet of light rail vehicles. The first car arrived on October 6, 2009.

Route

The Tide is designed with the hope that TOD (Transit-oriented development
Transit-oriented development
A transit-oriented development is a mixed-use residential or commercial area designed to maximize access to public transport, and often incorporates features to encourage transit ridership...

) will be constructed along the light rail line, creating a smart growth
Smart growth
Smart growth is an urban planning and transportation theory that concentrates growth in compact walkable urban centers to avoid sprawl and advocates compact, transit-oriented, walkable, bicycle-friendly land use, including neighborhood schools, complete streets, and mixed-use development with a...

 transit corridor to help guide growth using compact mixed-use development
Mixed-use development
Mixed-use development is the use of a building, set of buildings, or neighborhood for more than one purpose. Since the 1920s, zoning in some countries has required uses to be separated. However, when jobs, housing, and commercial activities are located close together, a community's transportation...

 practices, as well as curbing traffic congestion.

Current

Most of the Tide's route east of downtown Norfolk operates on newly-laid track along the former Norfolk & Southern Railway line that runs due east to the resort area of Virginia Beach. The Norfolk Southern Railway had previously abandoned that line. That right-of-way had carried both freight and passenger traffic until the end of World War II, and then operated as a freight-only railway for several additional decades. The current eastern end of The Tide is at Newtown Road, which is the Norfolk-Virginia Beach boundary line.

By contrast, The Tide's route from the Harbor Park area west within downtown Norfolk and north-west to the Medical Center area is entirely new right-of-way.

Future

The Commonwealth of Virginia's Department of Rail & Public Transportation is studying possible extensions to The Tide in several different directions within the multi-city Hampton Roads area.
Hampton Roads Transit, the Hampton Roads Transportation Planning Organization, and local cities are exploring extensions of the starter line. Possible extensions might run north to the Norfolk Naval Base, east to the Virginia Beach oceanfront and resort area, west to Portsmouth
Portsmouth, Virginia
Portsmouth is located in the Hampton Roads metropolitan area of the U.S. Commonwealth of Virginia. As of 2010, the city had a total population of 95,535.The Norfolk Naval Shipyard, often called the Norfolk Navy Yard, is a historic and active U.S...

, and south to Chesapeake
Chesapeake, Virginia
As of the census of 2000, there were 199,184 people, 69,900 households, and 54,172 families residing in the city. The population density was 584.6 people per square mile . There were 72,672 housing units at an average density of 213.3 per square mile...

.

Chesapeake

One possible extension would run south from Norfolk, probably terminating in the Greenbrier area of Chesapeake, VA.

Norfolk

A second possible extension would extending The Tide from the Medical Center terminus to Naval Station Norfolk
Naval Station Norfolk
Naval Station Norfolk, in Norfolk, Virginia, is a base of the United States Navy, supporting naval forces in the United States Fleet Forces Command, those operating in the Atlantic Ocean, Mediterranean Sea, and Indian Ocean...

, which would connect Old Dominion University
Old Dominion University
Old Dominion University is a state university located in Norfolk, Virginia, United States, and is accredited by the Southern Association of Colleges and Schools...

 to the light rail service. The naval base is one of the largest employers in the Hampton Roads area and ODU is a large public university.

Peninsula

The Peninsula Rapid Transit Project is exploring the feasibility of light rail in Newport News
Newport News, Virginia
Newport News is an independent city located in the Hampton Roads metropolitan area of Virginia. It is at the southeastern end of the Virginia Peninsula, on the north shore of the James River extending southeast from Skiffe's Creek along many miles of waterfront to the river's mouth at Newport News...

. Likely stops for The Tide on the Peninsula would include downtown Newport News, the Newport News
Newport News (Amtrak station)
The Newport News Amtrak station is located at 9304 Warwick Boulevard in Newport News, Virginia. It serves as the terminus of the Regional service which begins in Boston...

 Amtrak
Amtrak
The National Railroad Passenger Corporation, doing business as Amtrak , is a government-owned corporation that was organized on May 1, 1971, to provide intercity passenger train service in the United States. "Amtrak" is a portmanteau of the words "America" and "track". It is headquartered at Union...

 passenger railway station, the Oyster Point area, and Newport News/Williamsburg International Airport
Newport News/Williamsburg International Airport
Newport News/Williamsburg International Airport is an airport located 9 mi northwest of downtown Newport News, Virginia, and serves the entire Hampton Roads metropolitan area along with Norfolk International Airport in Norfolk...

. An extension between downtown Newport News and downtown Hampton is also being considered.

Virginia Beach

This proposed LRT extension would continue along the former Norfolk & Southern Railway right of way. Major stops would be located at the "Town Center
Virginia Beach Town Center
Virginia Beach Town Center is a group of offices, hotels, stores, and restaurants in Virginia Beach, Virginia.-Location:The Virginia Beach Town Center is located in the Central Business District of Virginia Beach across the street from Pembroke Mall...

" project in the Pembroke area, near Oceana Naval Air Station, and would terminate in the resort area at the Virginia Beach Convention Center, a few blocks west of the Atlantic Ocean. A possible spur would branch at the N&S Railway's Oceana Junction (just east of London Bridge Road and just north of Potters Road) and use the existing abandoned railway right-of-way along the west side of Oceana Naval Air Station to the south. As another possible LRT extension, most of the former N&S Railway line from the Witchduck Road area south to the Virginia Beach Municipal Center remains currently undeveloped.

The city of Virginia Beach may extend The Tide light rail service east from the Newtown Road terminus. Virginia Beach's mayor, Will Sessoms, said that the city hoped to purchase the right of way within two weeks. The city subsequently purchased the tracks for $40 million, using $10 million of local tax funds – which would allow a total rail length of about 18 miles. There are disagreements about the likely cost and the desirability of this proposed extension.

In the April 2011 State of the City, Sessoms said "whether the corridor is eventually developed with Bus Rapid Transit or a light rail line is unknown at this time," citing cost and ridership issues.

In April 2011, HRT paused the study until 9-12 months of ridership data from The Tide light rail in Norfolk is collected. This will allow the travel forecasting model for any extension to be calibrated based on actual ridership. During this pause, HRT will work on improving the definition of the alternatives under study. After the data has been collected, HRT will restart the VBTES, currently anticipated in the third quarter of 2012. The study is expected to be completed by the end of 2013.

Construction problems

In January 2010, HRT's executive director, Michael Townes, was pressured by the Board of Directors and ultimately agreed to step down after the project overshot its budget by $100 million dollars and missed by one year its operational deadline. A majority of the board members cited poor management and communication on his part. He was to serve at full pay and benefits helping with a transition and continue to seek additional funding until September 2010, after which the Board agreed to a severance package of full pay and benefits for another full year. As an interim measure, the Board hired former VDOT
Virginia Department of Transportation
The Virginia Department of Transportation is the agency of state government responsible for transportation in the state of Virginia in the United States. Headquartered in Downtown Richmond, VDOT is responsible for building, maintaining, and operating the roads, bridges and tunnels in the...

Commissioner Philip Shucet for 1 year affective February 1, 2010 at the rate of $40,000 per month to lead the agency, with a mandate to restore financial integrity and communication pending selection of a new Executive Director.

In May 2010 elections, voters ousted Norfolk city council Randy Wright, a long-time incumbent, HRT board member, and light rail supporter. His opponent, also an advocate of light rail, cited the waste and delays under Towne's administration. Wright blamed "the Tide" for his defeat, stating "The cost overruns were the difference... I didn't know about the overruns and couldn't have, but people just didn't believe that." Another HRT board member, Paige Washington, also lost a reelection bid in Hampton. News media sources reported that "Three million dollars [of HRT funds designated for projects on the Virginia Peninsula] were diverted to Norfolk to [help] pay for its light rail cost overrun"