South Humber Bank Power Station
Encyclopedia
South Humber Bank Power Station is a 1260MW
Watt
The watt is a derived unit of power in the International System of Units , named after the Scottish engineer James Watt . The unit, defined as one joule per second, measures the rate of energy conversion.-Definition:...

 gas-fired power station on South Marsh Road at Stallingborough
Stallingborough
Stallingborough is a village and civil parish in North East Lincolnshire, a short distance from both Grimsby and Immingham. The parish stretches from Lincolnshire to the Humber coast, and includes the hamlet of Little London.-Geography:...

 in North East Lincolnshire
North East Lincolnshire
North East Lincolnshire is a unitary authority in the Yorkshire and the Humber region of England, bordering the unitary authority of North Lincolnshire and the administrative county of Lincolnshire...

 north of Healing
Healing, Lincolnshire
Healing is a village and civil parish in North East Lincolnshire, England. It lies between Stallingborough and Great Coates, and to the west from Grimsby. Its population at the 2001 census was 2,606....

 and the A180
A180 road
The A180 is a primary route in northern England, that runs from the M180 motorway to Cleethorpes. The road is a continuation of the M180, but built to lower specifications: it is mainly dual two-lane without hard shoulders. The road is dual carriageway for from the M180 to Grimsby, and is a...

 near the South Marsh Road Industrial Estate.

It is owned by Centrica
Centrica
Centrica plc is a multinational utility company, based in the United Kingdom but also with interests in North America. Centrica is the largest supplier of gas to domestic customers in the UK, and one of the largest suppliers of electricity, operating under the trading names "Scottish Gas" in...

 Energy, being run as Centrica SHB Ltd. The plant manager is Tony Lyon. It is around two miles east of Immingham
Immingham
Immingham is a town in North East Lincolnshire, located on the south bank of the Humber Estuary...

, and employs 64 people. Centrica owns the most CCGT power stations (eight) in the UK, and South Humber Bank is its largest CCGT station. It is the only power station in North East Lincolnshire
North East Lincolnshire
North East Lincolnshire is a unitary authority in the Yorkshire and the Humber region of England, bordering the unitary authority of North Lincolnshire and the administrative county of Lincolnshire...

. The site of SHBPS is around 500 metres by 400 metres in area (around 54 acres). It is next door to the Synthomer plant.

History

The site was chosen by Dalton Warner Davis, the Chartered Surveyor
Chartered Surveyor
Chartered Surveyor is the description ofProfessional Members and Fellows of the RICS entitled to use the designation in Commonwealth countries and Ireland...

s.

Construction started in September 1994. Phase 1 was completed in April 1997 with 750MW of power, and entered commercial service in September 1997. Phase 2 was started in November 1996 and was completed in January 1999, adding 510MW. The plant was built by Switzerland
Switzerland
Switzerland name of one of the Swiss cantons. ; ; ; or ), in its full name the Swiss Confederation , is a federal republic consisting of 26 cantons, with Bern as the seat of the federal authorities. The country is situated in Western Europe,Or Central Europe depending on the definition....

's ABB.

Ownership

It was initially run by IVO Generation Services, a company owned by Finland's Fortum
Fortum
Fortum Oyj is a Finnish publicly listed energy company, which focuses on the Nordic and Baltic countries, Poland and the north-west of Russia. After acquisition of Russian energy company TGC-10 in year 2008, Western Siberia has become an important operating area for Fortum. The head of the company...

 (Imatran Voy Oyima). The site was owned by the consortium Humber Power Ltd, which was owned by Midland Power, ABB Energy Ventures, Tomen Group, Fortum Group, British Energy
British Energy
British Energy was the UK's largest electricity generation company by volume, before being taken over by Électricité de France in 2009. British Energy operated eight former UK state-owned nuclear power stations and one coal fired power station....

 and TotalFinaElf. Humber Power Ltd was formed in 1991.

On 29 May 2001, Centrica (as GB Gas Holdings Ltd) bought 60% of the power station, and with 40% owned by Chanter Petroleum (part of TOTAL
Total S.A.
Total S.A. is a French multinational oil company and one of the six "Supermajor" oil companies in the world.Its businesses cover the entire oil and gas chain, from crude oil and natural gas exploration and production to power generation, transportation, refining, petroleum product marketing, and...

 Midstream Holdings UK Ltd) from Humber Power Ltd. The entire site was then run by Centrica, under the name South Humber Power Ltd.

In September 2005, the station was bought outright (100%) by Centrica, costing £150m (£46.5 million in cash). Centrica also run Glanford Brigg Power Station
Glanford Brigg Power Station
Glanford Brigg Power Station is a gas-fired power station in North Lincolnshire, England. It is capable of firing diesel as a substitute of natural gas. It is situated on the River Ancholme, beside the Sheffield to Lincoln Line, outside the town of Brigg, with its name coming from the former name...

 and the A part of Killingholme Power Station
Killingholme Power Station
Killingholme Power Station is the name given to two CCGT natural gas power stations near to East Halton and North Killingholme in North Lincolnshire; Killigholme B opened in 1993 and is owned by E.ON UK and Killingholme A opened in 1994 and is owned by Centrica.-900 MW plant:The E.ON UK...

.

Specification

Cooling water is drawn from the River Humber. It is a CCGT
Combined cycle
In electric power generation a combined cycle is an assembly of heat engines that work in tandem off the same source of heat, converting it into mechanical energy, which in turn usually drives electrical generators...

 type power station using natural gas.

Phase 1 consists of three 166MW gas turbines with three heat recovery steam generators. It was designed and built by a consortium of CMI (Cockerill Maintenance & Ingenierie) and International Combustion
International Combustion
International Combustion Limited was a major manufacturing business based in Derby offering products for the nuclear engineering industry. International Combustion Australia Limited was a separate non-affiliated company.-History:...

, and 255MW steam turbine
Steam turbine
A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into rotary motion. Its modern manifestation was invented by Sir Charles Parsons in 1884....

.

Phase 2 consists of two 169MW gas turbines, two heat recovery steam generators and a 171MW steam turbine. It is similar to two CCGTs next-door to each other.

The gas turbines used are ABB Alstom
Alstom
Alstom is a large multinational conglomerate which holds interests in the power generation and transport markets. According to the company website, in the years 2010-2011 Alstom had annual sales of over €20.9 billion, and employed more than 85,000 people in 70 countries. Alstom's headquarters are...

 GT 13E2 engines which normally produce 165MW each. Each gas turbine has 72 EV (conical pre-mix) burners. Exhaust gas leaves each turbine at 540C. The engines spin at 3000rpm
Revolutions per minute
Revolutions per minute is a measure of the frequency of a rotation. It annotates the number of full rotations completed in one minute around a fixed axis...

. The gas turbines are each connected to an ABB WY21 TEWAC turbo generator
Turbo generator
A turbo generator is a turbine directly connected to an electric generator for the generation of electric power. Large steam powered turbo generators provide the majority of the world's electricity and are also used by steam powered turbo-electric ships.Smaller turbo-generators with gas turbines...

.

Exhaust gas from each gas turbine passes through an individual CMI heat recovery steam generator (HRSG). For Phase 1 the steam passes through an ABB steam turbine connected to an ABB 50WT hydrogen-cooled turbogenerator
Hydrogen-cooled turbogenerator
A hydrogen-cooled turbo generator is a turbo generator with gaseous hydrogen as a coolant. Hydrogen-cooled turbo generators are designed to provide a low-drag atmosphere and cooling for single-shaft and combined-cycle applications in combination with steam turbines...

. For Phase 2 the steam passes through an ABB steam turbine connected to an ABB WY21 TEWAC (air-water-cooled) turbogenerator. The Phase 1 generator is larger than Phase 2 so needs to be cooled by hydrogen gas.
The terminal voltage of the generators is 15.75kV. Electricity enters the National Grid via a transformer at 400kV connected to a single pylon line. The engines can generate electricity for base load
Base load power plant
Baseload is the minimum amount of power that a utility or distribution company must make available to its customers, or the amount of power required to meet minimum demands based on reasonable expectations of customer requirements...

 or for peak load
Peaking power plant
Peaking power plants, also known as peaker plants, and occasionally just "peakers," are power plants that generally run only when there is a high demand, known as peak demand, for electricity.-Peak hours:...

 operations. Performance of the power plant is dependent on local air temperature and humidity. It has a nominal thermal efficiency of 55%, but usually produces 51%.

In 2009 it produced 8,512 GWh of electricity.

External links


News items

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK