Mission to Mir (film)
Encyclopedia

Filming

Footage seen within the movie was compiled from multiple sources. These include IMAX cameras taken into space on the Space Shuttle. IMAX cameras were taken to the Mir Space Station on Space Shuttle missions: STS-63, STS-71
STS-71
STS-71 was the third mission of the US/Russian Shuttle-Mir Program, which carried out the first Space Shuttle docking to Mir, a Russian space station. The mission used Space Shuttle Atlantis, which lifted off from launch pad 39A on 27 June 1995 from Kennedy Space Center, Florida...

, STS-74
STS-74
STS-74 was a Space Shuttle Atlantis mission to the Mir space station. It was the fourth mission of the US/Russian Shuttle-Mir Program, and it carried out the second docking of a space shuttle to Mir. Atlantis lifted off for the mission on 12 November 1995 from Kennedy Space Center launch pad 39A,...

 and STS-79
STS-79
STS-79 was a Space Shuttle Atlantis mission to the Mir space station. It was the first shuttle mission to dock with Mir once it was fully assembled.-Crew:-Mission parameters:*Mass:**Spacehab-Double Module **Orbiter Docking System...

. The main subject of the film were Mir missions: Mir EO-18, Mir EO-19, Mir EO-20, Mir EO-21 and Mir EO-22.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK