The Mariinsky Theater Second Stage is a planned second part of a theatre complex which will be made up of the original 1860 Mariinsky Theatre and the 2007 Mariinsky Theatre Concert Hall. The Second Stage is currently under construction and is being financed by the federal budget. Throughout construction, which began in 2003, various changes have had to be made and this has led to an increase in expenses.

The post-modernist French
French people
The French are a nation that share a common French culture and speak the French language as a mother tongue. Historically, the French population are descended from peoples of Celtic, Latin and Germanic origin, and are today a mixture of several ethnic groups...

 architect Dominique Perrault
Dominique Perrault
Dominique Perrault is a French architect. He became world known for the design of the French National Library, distinguished with the Mies van der Rohe Prize in 1996....

 won a much-publicised contest for his design for a new home for the theatre, which is to be located adjacent to the current building. At the same time, the historic original structure had been due to undergo a complete renovation and this was planned to begin in the Autumn 2006.

After seeing projected costs rise to $244 million (U.S.) from $100 million, the Russian government announced in November 2008 that it was killing the Perrault plan. The Russian Prime Minister Vladimir Putin
Vladimir Putin
Vladimir Vladimirovich Putin served as the second President of the Russian Federation and is the current Prime Minister of Russia, as well as chairman of United Russia and Chairman of the Council of Ministers of the Union of Russia and Belarus. He became acting President on 31 December 1999, when...

 overruled both Valery Gergiev
Valery Gergiev
Valery Abisalovich Gergiev is a Russian conductor and opera company director. He is general director and artistic director of the Mariinsky Theatre, principal conductor of the London Symphony Orchestra, and artistic director of the White Nights Festival in St. Petersburg.- Early life :Gergiev,...

 (the artistic director of the Mariinsky Theatre) and the Minister for Culture, announcing in early June 2009 that there would be a new competition to solicit proposals. 15 proposals were received, a list which was then shortened to five. "We wanted to give the impression that although we were in a tense situation and we didn't want to delay forever ... no one felt like it was the best way to simply sit down quietly and say, 'You are a great architect; just come and do it,'" Mr. Gergiev explained.

With a budget of €295-million (about US $452-million), all of which will be paid by the Russian government with a completion date of no later than December 2011, the Canadian firm, Diamond and Schmitt Architects
Diamond and Schmitt Architects
Diamond and Schmitt Architects Incorporated is an architectural practice founded in 1975 and located in Toronto, Ontario Canada. The firm currently employs 137 people.-History:...

, prevailed over four other finalists, one of which came from Germany and three from Russia. The building has been hyped as "Russia's most important building project in 70 years". As noted by Mr. Diamond, (it is) "the first major opera house to be built in Russia since the Czars."

Building construction history

At the end of the design competition for The Second Stage of the Maryinsky Theater in 2003, 11 proposals had been received. The winner was well-known French architect Dominique Perrault
Dominique Perrault
Dominique Perrault is a French architect. He became world known for the design of the French National Library, distinguished with the Mies van der Rohe Prize in 1996....

 with «a gold cocoon» (an external cover of a building of the wrong form from glass
Glass
Glass is an amorphous solid material. Glasses are typically brittle and optically transparent.The most familiar type of glass, used for centuries in windows and drinking vessels, is soda-lime glass, composed of about 75% silica plus Na2O, CaO, and several minor additives...

 and aluminium
Aluminium
Aluminium or aluminum is a silvery white member of the boron group of chemical elements. It has the symbol Al, and its atomic number is 13. It is not soluble in water under normal circumstances....

).

By 2005 experts discovered that detailed proposals presented by the competition winner did not meet Russian building codes
Russian National Standards
Russian national technical standards are developed under the auspices of the Russia's Federal Agency for Technical Regulation and Metrology ....

. They failed to include sections relating to water supply
Water supply
Water supply is the provision of water by public utilities, commercial organisations, community endeavours or by individuals, usually via a system of pumps and pipes...

, drainage, and ventilation
Ventilation (architecture)
Ventilating is the process of "changing" or replacing air in any space to provide high indoor air quality...

 . The result was that in 2007, FGU ("Northwest management on building, reconstruction and restorations") terminated the contract with the French architectural firm.

However, in June of that year the new general contractor, "Joint-Stock Company "NPO" Georeconstruction-fundamentproekt", in a short space of time removed all 286 obstacles shown on the working drawings of Perrault
Dominique Perrault
Dominique Perrault is a French architect. He became world known for the design of the French National Library, distinguished with the Mies van der Rohe Prize in 1996....

. As had become clear, the winning design was far from that presented when it won the international competition. In particular, it was necessary to make changes - based on the Saint Petersburg climate - in order to strengthen load-bearing structures above which the gold cuplola would be located. As a result, the building would not look so open to the air. By July, the project had been simplified as much as possible, and it was determined that it would "not intrude so much into the existing city environment", Gergiev said. The height of the building was reduced and other elements were also reconsidered.

In 2008 the foundation work for the building of the theatre continued, but by April, it was found that the consistency of the soil under the construction area was unpredictable. (Later builders have compared the properties of the soil to those of sour cream
Sour cream
Sour cream is a dairy product rich in fats obtained by fermenting a regular cream by certain kinds of lactic acid bacteria. The bacterial culture, which is introduced either deliberately or naturally, sours and thickens the cream. Its name stems from the production of lactic acid by bacterial...

). In order to overcome these problems, the builders strengthened the consistency of the soil to a depth of 12 to 14 metres and, as a result, cost estimates had to be increased.
Also, the builders informed the authorities that the construction of a glass dome, as planned by Dominique Perrault's architectural firm, was impossible. Therefore that part of the project would have to be changed.

By June, the project had a new local architect partner, KB ViPS Architects, a firm working on high-rise and underground construction, and it became the third firm to work on the building.

During 2009 foundation work was completed. Valery Gutovsky, the director of KB ViPS Architects, a specialist in high-rise and underground construction, became the new head of construction for the project., and on 29 May Vladimir Putin
Vladimir Putin
Vladimir Vladimirovich Putin served as the second President of the Russian Federation and is the current Prime Minister of Russia, as well as chairman of United Russia and Chairman of the Council of Ministers of the Union of Russia and Belarus. He became acting President on 31 December 1999, when...

 held a meeting at which he confirmed that the building would be completed in 2011 at the cost estimated in the published budget.

On 28 July the result of the last competition was announced, the winner being KB ViPS Architects, a specialist in high-rise and underground construction. Within a month, a contract was signed with that company and construction proceeded, with some parts of the building then reaching a height 5 metres. At the same time, according to Valery Gutovsky, the project was to be submitted to the town-planning council of St. Petersburg in October 2009 and to Glavgosekspertiza ("The General State Expert Review Department of the State Committee for Construction, Housing and Utilities" which was authorized to perform the state expert review of all projects by spring 2010.. The construction cost was estimated at 8.5 billion
1000000000 (number)
1,000,000,000 is the natural number following 999,999,999 and preceding 1,000,000,001.In scientific notation, it is written as 109....

roubles.

External links

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK