Fairlie Branch
Encyclopedia
The Fairlie Branch was a branch line
Branch line
A branch line is a secondary railway line which branches off a more important through route, usually a main line. A very short branch line may be called a spur line...

 railway in southern Canterbury
Canterbury, New Zealand
The New Zealand region of Canterbury is mainly composed of the Canterbury Plains and the surrounding mountains. Its main city, Christchurch, hosts the main office of the Christchurch City Council, the Canterbury Regional Council - called Environment Canterbury - and the University of Canterbury.-...

 which formed part of New Zealand
New Zealand
New Zealand is an island country in the south-western Pacific Ocean comprising two main landmasses and numerous smaller islands. The country is situated some east of Australia across the Tasman Sea, and roughly south of the Pacific island nations of New Caledonia, Fiji, and Tonga...

's national railway network
Rail transport in New Zealand
Rail transport in New Zealand consists of a network of gauge railway lines in both the North and South Islands. Rail services are focused primarily on freight, particularly bulk freight, with limited passenger services on some lines...

. Construction began in 1874, and at its farthest extent, it terminated just beyond Fairlie
Fairlie, New Zealand
FairlieUrban AreaPopulation:723Extent:Territorial AuthorityName:Mackenzie District CouncilPopulation:Mayor:Website:Extent:Regional councilName:Environment Canterbury...

 in Eversley. Its closure came in 1968, but a portion remains open in Pleasant Point
Pleasant Point, New Zealand
Pleasant Point is a small country town in southern Canterbury, New Zealand, some 19 km inland from Timaru. A service town for the surrounding farming district, it has a population of 1,222 and one of its main attractions is the heritage railway, the Pleasant Point Museum and Railway, which...

 as the Pleasant Point Museum and Railway
Pleasant Point Museum and Railway
thumb|right|Pleasant Point Museum and Railway YardThe Pleasant Point Museum and Railway is a narrow gauge heritage railway located in the small country town of Pleasant Point in southern Canterbury, New Zealand, inland from Timaru. Its main terminal is located at Pleasant Point station, which was...

.

Construction

Proposed in the early 1870s, the local government voted in favour of a branch line from Timaru
Timaru
TimaruUrban AreaPopulation:27,200Extent:Former Timaru City CouncilTerritorial AuthorityName:Timaru District CouncilPopulation:42,867 Land area:2,736.54 km² Mayor:Janie AnnearWebsite:...

 to Pleasant Point in December 1872 and a construction contract was let in the following March. After a railway act approving the line was passed later in 1873, construction could commence, and it did so on 18 February 1874. The branch left the Main South Line
Main South Line
The Main South Line, sometimes referred to as part of the South Island Main Trunk Railway, is a railroad line that runs north and south from Lyttelton in New Zealand through Christchurch and along the east coast of the South Island to Invercargill via Dunedin...

 in Washdyke
Washdyke
Washdyke is an industrial suburb in the north of Timaru, in south Canterbury, New Zealand. State Highway 1 passes through Washdyke on the way north out of the city...

, now a northern suburb of Timaru, and headed northwest towards Pleasant Point. Construction of this 14.42 km of railway proceeded without any notable difficulties, opening for service on 24 December 1875 - though trains had been able to run to Pleasant Point as early as two months previously. An extension followed swiftly, and the 27 km addition to Albury
Albury, New Zealand
AlburyUrban AreaPopulation:Extent:Territorial AuthorityName:Mackenzie District CouncilPopulation:Mayor:Website:Extent:Regional councilName:Environment Canterbury...

 opened on 1 January 1877.

After this point, however, construction stalled. On 13 August 1880, the Timaru Chamber of Commerce passed a resolution to pressure the government to call tenders for construction of the remainder of the line. This was followed by a public meeting in Fairlie on 25 March 1882 that issued the same demand on the government, asserting that the line to Albury was the best paying in New Zealand and an extension would provide more convenient access to much of the freight then conveyed to the Albury terminus. Contracts were soon let, and the next 12 km to Winscombe
Winscombe, New Zealand
Winscombe is a lightly populated locality in the southern part of the Canterbury region of New Zealand's South Island. It is situated inland from Timaru on State Highway 8 between Pleasant Point and Fairlie. It is located in a very rural setting....

 were opened on 24 August 1883. Less than half a year later, the final portion of the line was opened for general traffic to the locale of Eversley, just beyond Fairlie, on 28 January 1884, giving the branch a full length of 58.2 km. Some sources, including Railways Department publications, incorrectly state this happened on 9 January 1884. The opening of the line was celebrated on 30 January 1884 by a public holiday in Fairlie and environs, and an excursion train ran from Timaru conveying 600-700 passengers for the occasion. This train was double-headed
Double-heading
In railroad terminology, double-heading or double heading indicates the use of two locomotives at the front of a train, each operated individually by its own crew. The practice of triple-heading involves the use of three locomotives....

 by K 88
NZR K class (1877)
The NZR Rogers K class was the first example of American-built locomotives to be used on New Zealand's railways. Their success coloured locomotive development in New Zealand until the end of steam.-History:...

 Washington and a member of the F class
NZR F class
The NZR F class was the first important class of steam locomotive built to operate on New Zealand's railway network after the national gauge of 1067 millimetres was adopted. The first locomotives built for the new 1067 mm railways were two E class double Fairlies for the Dunedin and Port Chalmers...

, and it consisted of a guard's van and 14 carriages, some of which were brought down from Christchurch the previous morning to cater for the anticipated large crowd.

There were plans to extend the branch even further to Burkes Pass and the Mackenzie Country. 27 kilometres of formation were made to varying standards of completion, but ultimately no rails were laid and the line's farthest terminus remained Eversley.

Stations

The following stations were located on the Fairlie Branch (in brackets is the distance from Washdyke):
  • Racecourse (?? km)
  • Cartwright's Road Crossing (?? km)
  • Levels (5.91 km)
  • Waitawa (approximately 10 km)
  • Pleasant Point (14.42 km)
  • Sutherlands (21.89 km)
  • Cave (29.89 km)
  • Ma Waro (35.38 km)
  • Albury (41.18 km)
  • Tengawai (approximately 42 km)
  • Cricklewood (47.73 km)
  • Winscombe (52.75 km)
  • Fairlie (56.89 km), known as Fairlie Creek until a name change was approved on 9 May 1892
  • Eversley (58.2 km)


The Fairlie station was destroyed by fire on at least two occasions, first on 13 January 1890 and again on the night of 8 August 1908. After the 1908 fire, the post and telegraph office formerly based at Fairlie station was housed in a temporary building; this too was burnt down in a suspected act of arson on the morning of 20 September 1908.

Operation

The line's reason for existence was to open up farmland in the region behind Timaru and promote rural development. When opened to Pleasant Point, two trains ran each way a day, and while the line had its terminus in Albury, significant traffic was generated by wool and grain being carried by dray to the station from regions further inland. Upon opening to Fairlie, the line's timetable was initially adjusted to the pattern typical of many rural New Zealand branch lines, with a single mixed train
Mixed train
A mixed train is a train that hauls both passenger and freight cars or wagons. In the early days of railways they were quite common, but by the 20th century they were largely confined to branch lines with little traffic. As the trains provided passengers with very slow service, mixed trains have...

 carrying both passengers and freight running each way per day. Special freight trains ran as necessary, especially to collect livestock from Pleasant Point. For a period, the line also had its own dedicated passenger train, nicknamed the "Fairlie Flyer", but it perhaps did not live up to its fast-sounding name; by the late 1920s, it was quicker to travel by car between Fairlie and Timaru, which resulted in a decline of traffic that led to the train's cancellation in 1930. From this time, passengers were solely catered for by the daily mixed train.

The line had also started making a loss around this period, and on 1 April 1934, the short section from Fairlie to Eversley was closed. It had always been operated as an extension of the Fairlie yard and its existence had become redundant. The rest of the line entered into a slow demise, with passenger services cut to thrice weekly in 1953; the mixed train operated Mondays, Wednesdays, and Fridays, with solely freight carried on Tuesdays and Thursdays. On 2 November 1953, passenger provisions were cancelled entirely and all services became freight only. With the cessation of the mixed trains, the small locomotive depot
Motive power depot
Motive power depot, usually abbreviated to MPD, is a name given to places where locomotives are stored when not being used, and also repaired and maintained. They were originally known as "running sheds", "engine sheds", or, for short, just sheds. Facilities are provided for refuelling and...

 in Fairlie closed and the freight trains were operated every weekday morning from Timaru. Intense competition from road posed problems for the line, and what traffic it did retain was mainly due to government subsidies. Despite this, by 1966, the livestock traffic that had been the line's primary cargo was all but non-existent and the decision was soon made to close the line. The date of closure was 2 March 1968 and the occasion was marked by a special return of the Fairlie Flyer, attracting large crowds of locals.

The branch today

Remnants of closed railway lines diminish and disappear as a result of natural and human activity, but some relics from the Fairlie Branch's operating days still exist, most notably the 2.5 km of restored trackage still in use by the Pleasant Point Museum and Railway
Pleasant Point Museum and Railway
thumb|right|Pleasant Point Museum and Railway YardThe Pleasant Point Museum and Railway is a narrow gauge heritage railway located in the small country town of Pleasant Point in southern Canterbury, New Zealand, inland from Timaru. Its main terminal is located at Pleasant Point station, which was...

. At Washdyke, the first few hundred metres of the branch were retained as a backshunt
Backshunt
* A backshunt is a railway track configuration in situations where a change in direction is required and a traditional curve cannot fit.There are two main applications of a backshunt....

 and to provide access to an industrial siding
Rail siding
A siding, in rail terminology, is a low-speed track section distinct from a running line or through route such as a main line or branch line or spur. It may connect to through track or to other sidings at either end...

, and the track currently remains in place. For much of the line's length from Timaru to Fairlie, the formation can be seen making its way through the rolling countryside, and abutments and piles still stand at the site of some bridges. One bridge itself still stands, near Winscombe. Loading banks still exist at the site of Levels, Waitawa, Sutherlands, and Cave stations. Levels also still possesses its goods shed
Goods shed
A goods shed is a railway building designed for storing goods before or after carriage in a train.A typical goods shed will have a track running through it to allow goods wagons to be unloaded under cover, although sometimes they were built alongside a track with possibly just a canopy over the door...

 and Waitawa has the remnants of a platform, and water vat foundations remain in Levels and Tengawai. Beyond Eversley, the formation that was constructed but never used can still be seen and is particularly clear near Kimbell.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK