China Railways CRH380A
Encyclopedia
The CRH380A is an electric high-speed train designed by China South Locomotive & Rolling Stock Corporation Limited (CSR) and manufactured by CSR Qingdao Sifang Locomotive & Rolling Stock Co., Ltd. A continuation of the CRH2-350 program it both replaces foreign technology in the CRH2 with Chinese developments and increases the top speed. The CRH380A is designed to operate at a cruise speed of 350 km/h (217 mph) and a maximum of 380 km/h (236 mph) in commercial service. The original 8-car train-set recorded a top speed of 416.6 km/h (258.9 mph) during a trial run and the longer 16-car train-set holds the world record for the fastest production train at 486.1 km/h (302 mph).
CRH380A is one of the four Chinese train series which have been designed for the new standard operating speed of 380 km/h (236 mph) on newly constructed Chinese high-speed main lines. The other three are CRH380B, CRH380C and CRH380D. The CRH380B has been developed by China North Locomotive and Rolling Stock Industry (Group) Corporation (CNR) in cooperation with Siemens
, and it is manufactured by Tangshan Railway Vehicle
and Changchun Railway Vehicle. The CRH380C is based on the CRH380B. It incorporates a redesigned nose and electrical equipment from Hitachi
. The CRH380D is Bombardier
's Zefiro 380
, which is a special design for China Railways
, to be produced at Bombardier Sifang (Qingdao) Transportation Ltd, a joint venture by Bombadier and CSR Sifang.
The original project was named "CRH2-350". On February 26, 2008,the Chinese Ministry of Science and Ministry of Railway signed the Agreement on Joint and Independent Innovations of China High-speed Trains, CRH2-350 is one of the most important projects of this plan, the purpose is to develop Chinese designed new-generation High Speed train with continuous operating speed to be 350 km/h (217 mph), and maximum operating speed up to 380 km/h (236 mph). The new generations of rolling stock are expected to be used on the Beijing-Shanghai High-Speed Railway. the project officially launched in 2009, and was included in the "Eleventh Five-Year Plan"'s National technology support program for key technology and equipment development of China' s high speed train.
The design work includes four categories: schematic, technical, construction, and experimentation/verification. based on the analysis of large amounts of data and experience from the operation of the Beijing-Tianjin high-speed rail. the MOR completed a series of initial system and optimized subsystem design, then provided CSR sifang with primary data and design. CSR presented more than 20 types of designs. After further comparison, calculation, optimization, simulation and testwork, on April 12, 2010, the final design was published on the Official conference held by Sifang.The train model was exhibited in May at the China Railway Pavilion in the Shanghai World Expo Park (IRJ July p5).
On September 2009, the Ministry of Railways (MOR) for china had ordered 100 16-car and 40 eight-car new-generation high-speed trains from CSR Sifang Locomotive & Rolling Stock, the contract worth 45 billion RMB (US$ 6.64 billion).
The initial standard CRH380A trainsets was delivered on August 2010, The first test on conventional rail, based on a daily-service mode, was conducted on September 28, 2010.
The test was held on the Shanghai–Hangzhou High-Speed Railway
(also known as the Huhang high-speed railway, "Hu" stands for "Shanghai
", "Hang" stands for Hangzhou
; Hangzhou is the capital city of Zhejiang Province). The trainset with series number CRH380A-6001 reached the maximum speed of 416.6 km/h (258.9 mph).
The first set of CRH380AL, series number CRH380A-6041L, rolled off line by October 2010. On November 8, 2010, the 16-car train was sent to Beijing loop line for test. On November 20, 2010, the train was sent to Beijing–Shanghai High-Speed Railway for trial run. On November 26, 2010, the first 380 km/h (236 mph) test run at the Beijing–Shanghai High-Speed Railway was launched at Zaozhuang - Bengbu section. The trainset with series number CRH380A-6041L reached the maximum speed of 486.1 km/h (302 mph) on December 3, 2010. During the test, It traveled 220 km (137 mi) in 34 minutes, at average speed of 388 km/h (241 mph).
occasionally.
On October 26, 2010, CRH380A entered regular service at the Shanghai–Hangzhou High-Speed Railway
and Shanghai–Nanjing High-Speed Railway
. The maximum operational speed reaches 355 km/h (221 mph), and this is always restricted by the software of the computerized control system. The travel time between Shanghai and Hangzhou reduced from 1 hour 18 minutes to 45 minutes. and travel time between Nanjing and Hangzhou reduced from 3 hour 19 minutes to 2 hour 48 minutes.
CRH380A started daily service at the Wuhan-Guangzhou High-Speed Railway as of December 3, 2010.
CRH380AL : CRH380A-6041L ~ CRH380A-6140L.
Power Destination
Coach Type
Coach No.1 and No.8 has 46 2nd class seats and 6 VIP seats
CRH380A is one of the four Chinese train series which have been designed for the new standard operating speed of 380 km/h (236 mph) on newly constructed Chinese high-speed main lines. The other three are CRH380B, CRH380C and CRH380D. The CRH380B has been developed by China North Locomotive and Rolling Stock Industry (Group) Corporation (CNR) in cooperation with Siemens
Siemens
Siemens may refer toSiemens, a German family name carried by generations of telecommunications industrialists, including:* Werner von Siemens , inventor, founder of Siemens AG...
, and it is manufactured by Tangshan Railway Vehicle
Tangshan Railway Vehicle
CNR Tangshan Railway Vehicle Co. Ltd. , formerly known as Tangshan Locomotive and Rolling Stock Works, is a manufacturer of locomotives and rolling stock located in Tangshan, Hebei province, People's Republic of China...
and Changchun Railway Vehicle. The CRH380C is based on the CRH380B. It incorporates a redesigned nose and electrical equipment from Hitachi
Hitachi
Hitachi is a multinational corporation specializing in high-technology.Hitachi may also refer to:*Hitachi, Ibaraki, Japan*Hitachi province, former province of Japan*Prince Hitachi and Princess Hitachi, members of the Japanese imperial family...
. The CRH380D is Bombardier
Bombardier Transportation
Bombardier Transportation is the rail equipment division of the Canadian firm, Bombardier Inc. Bombardier Transportation is one of the world's largest companies in the rail-equipment manufacturing and servicing industry. Its headquarters are in Berlin, Germany....
's Zefiro 380
Bombardier Zefiro
The Bombardier Zefiro trains are a family of high speed and very high speed passenger trains with top operating speeds from upwards. The trains are the design of Bombardier Transportation....
, which is a special design for China Railways
China Railways
China Railways is the national railway operator of the People's Republic of China, under the Chinese Ministry of Railways.China Railways operates rail commuter and freight transport via several smaller companies....
, to be produced at Bombardier Sifang (Qingdao) Transportation Ltd, a joint venture by Bombadier and CSR Sifang.
History
The development started in early 2008, during the research procedure of CRH2-300 (later CRH2C), the CSR conducted more than 1000 technical tests covering 17 specific areas such as dynamic performance, pantograph-catenary current collection, aerodynamics, and traction performance. CSR discovered the technology to increase the maximum speed. These research findings were fed into the design for the new-generation high-speed train.The original project was named "CRH2-350". On February 26, 2008,the Chinese Ministry of Science and Ministry of Railway signed the Agreement on Joint and Independent Innovations of China High-speed Trains, CRH2-350 is one of the most important projects of this plan, the purpose is to develop Chinese designed new-generation High Speed train with continuous operating speed to be 350 km/h (217 mph), and maximum operating speed up to 380 km/h (236 mph). The new generations of rolling stock are expected to be used on the Beijing-Shanghai High-Speed Railway. the project officially launched in 2009, and was included in the "Eleventh Five-Year Plan"'s National technology support program for key technology and equipment development of China' s high speed train.
The design work includes four categories: schematic, technical, construction, and experimentation/verification. based on the analysis of large amounts of data and experience from the operation of the Beijing-Tianjin high-speed rail. the MOR completed a series of initial system and optimized subsystem design, then provided CSR sifang with primary data and design. CSR presented more than 20 types of designs. After further comparison, calculation, optimization, simulation and testwork, on April 12, 2010, the final design was published on the Official conference held by Sifang.The train model was exhibited in May at the China Railway Pavilion in the Shanghai World Expo Park (IRJ July p5).
On September 2009, the Ministry of Railways (MOR) for china had ordered 100 16-car and 40 eight-car new-generation high-speed trains from CSR Sifang Locomotive & Rolling Stock, the contract worth 45 billion RMB (US$ 6.64 billion).
Technical features
According to CSR, the overall design of CRH380A reflects ten major goals.- Low-resistance, streamlined head. The nose of the train has a resistance coefficient of less than 0.13, aerodynamic resistance was reduced by 6.1%, aerodynamic noise by 7%, aerodynamic lift by 51.7% and the lateral force acting on the head by 6.1%.
- Vibration mode system matching. The CRH380A uses a lightweight aluminum alloy body whose total weight is no more than 9 t (8.9 LT), less than 17% of the entire vehicle; CSR has comprehensively improved the body structure, adopting a large number of new vibration damping materials. It also designed the bogie to match the performance of the body and optimized the train body's natural frequencies, which helps reduce structural vibrations at high speeds and improves ride comfort.
- Highly pressurized tight body. The pressure change rate inside the train is less than 200 Pa (0.0290075475467502 psi)/s, with the maximum pressure change inside the train remaining below 800 Pa (0.116030190187001 psi) compared with the standard value of 1000 Pa (0.145037737733751 psi). This ensures good ride quality at high speed.
- Safe and reliable high-speed bogies. The train is equipped with SWMB-400/SWTB-400 bolster-less bogies. These are a redesign of the SWMB-350/SWTB-350 bogies used by CRH2C; their critical instability speed is 550 km/h (342 mph). The new train's derail coefficient is 0.34 at a speed of 386 km/h (240 mph) while the maximun derail coefficient of the CRH2A is 0.73.
- Advanced noise control technology. By reducing sources of noise and adopting new sound absorbing and insulating materials, CSR has been able to control noise inside the train. The noise level is at 67dB - 69dB when running at 350 km/h (217 mph), which is similar to the CRH2A running at 250 km/h (155 mph).
- High-performance traction system, with YQ-365 motors manufactured by CSR Zhuzhou Electric Co., Ltd and CI11 Traction converters by Zhuzhou times electric co.,Ltd. The CRH380A has a new power unit configuration to maximize traction power. This allows the train to accelerate to 380 km/h (236 mph) in 7 minutes.
- Regenerative braking with a maximum energy feedback rate of 95%. With each stop nearly 800 kWh of electric power can be fed back to the electric grid.
Test
The prototype vehicle was rolled off on April, 2010, the eight-car train was being tested on the China Academy of Railway Sciences experimental loop line (Beijing loop line) startes from April 26, 2010. and started trial runs on the Zhengzhou - Xi'an high-speed line on June 7, 2010.The initial standard CRH380A trainsets was delivered on August 2010, The first test on conventional rail, based on a daily-service mode, was conducted on September 28, 2010.
The test was held on the Shanghai–Hangzhou High-Speed Railway
Shanghai–Hangzhou High-Speed Railway
The Shanghai–Hangzhou High-Speed Railway , also known as the Huhang High-Speed Railway or Huhang Passenger Railway is a high-speed rail line in China between Shanghai and Hangzhou. The line is in length and designed for commercial train service at . It was built in 20 months and opened on October...
(also known as the Huhang high-speed railway, "Hu" stands for "Shanghai
Shanghai
Shanghai is the largest city by population in China and the largest city proper in the world. It is one of the four province-level municipalities in the People's Republic of China, with a total population of over 23 million as of 2010...
", "Hang" stands for Hangzhou
Hangzhou
Hangzhou , formerly transliterated as Hangchow, is the capital and largest city of Zhejiang Province in Eastern China. Governed as a sub-provincial city, and as of 2010, its entire administrative division or prefecture had a registered population of 8.7 million people...
; Hangzhou is the capital city of Zhejiang Province). The trainset with series number CRH380A-6001 reached the maximum speed of 416.6 km/h (258.9 mph).
The first set of CRH380AL, series number CRH380A-6041L, rolled off line by October 2010. On November 8, 2010, the 16-car train was sent to Beijing loop line for test. On November 20, 2010, the train was sent to Beijing–Shanghai High-Speed Railway for trial run. On November 26, 2010, the first 380 km/h (236 mph) test run at the Beijing–Shanghai High-Speed Railway was launched at Zaozhuang - Bengbu section. The trainset with series number CRH380A-6041L reached the maximum speed of 486.1 km/h (302 mph) on December 3, 2010. During the test, It traveled 220 km (137 mi) in 34 minutes, at average speed of 388 km/h (241 mph).
Commercialization
CRH380A entered into daily service immediately after the test. Since September 30, 2010, it has been serving the Shanghai–Nanjing High-Speed RailwayShanghai–Nanjing High-Speed Railway
The Shanghai–Nanjing Intercity High-Speed Railway or Huning Intercity High-Speed Railway is a long high-speed rail line between Shanghai and Nanjing in the People's Republic of China. Hu and Ning are, respectively, shorthand Chinese names for Shanghai and Nanjing...
occasionally.
On October 26, 2010, CRH380A entered regular service at the Shanghai–Hangzhou High-Speed Railway
Shanghai–Hangzhou High-Speed Railway
The Shanghai–Hangzhou High-Speed Railway , also known as the Huhang High-Speed Railway or Huhang Passenger Railway is a high-speed rail line in China between Shanghai and Hangzhou. The line is in length and designed for commercial train service at . It was built in 20 months and opened on October...
and Shanghai–Nanjing High-Speed Railway
Shanghai–Nanjing High-Speed Railway
The Shanghai–Nanjing Intercity High-Speed Railway or Huning Intercity High-Speed Railway is a long high-speed rail line between Shanghai and Nanjing in the People's Republic of China. Hu and Ning are, respectively, shorthand Chinese names for Shanghai and Nanjing...
. The maximum operational speed reaches 355 km/h (221 mph), and this is always restricted by the software of the computerized control system. The travel time between Shanghai and Hangzhou reduced from 1 hour 18 minutes to 45 minutes. and travel time between Nanjing and Hangzhou reduced from 3 hour 19 minutes to 2 hour 48 minutes.
CRH380A started daily service at the Wuhan-Guangzhou High-Speed Railway as of December 3, 2010.
Train series number
CRH380A : CRH380A-6001 ~ CRH380A-6040.CRH380AL : CRH380A-6041L ~ CRH380A-6140L.
Formation
Each CRH380A has eight coaches, Units with standard compartments were formed as follows:Power Destination
- M - Motor car
- T - Trailer car
- C - Driver cabin
- P - Pantograph
Coach Type
- SW - Business Class Coach
- ZY - First Class Coach
- ZE - Second Class Coach
- CA - Dining Car
- ZEC - Second Class Coach/Dining Car
- ZYG - First Class Coach/Sightseeing Car
- ZEG - Second Class Coach/Sightseeing Car
CRH380A
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
---|---|---|---|---|---|---|---|---|
Type | ZEG | ZE | ZY | ZEC | ZE | ZEG | ||
Power Configuration | TC | M | MP | M | MP | M | TC | |
52 | 85 | 44 | 51 | 40 | 85 | 85 | 52 |
CRH380AL
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | ZYG | ZY | SW | ZY | ZE | CA | ZE | ZYG | ||||||||
Power Configuration | TC | M | MP | M | MP | M | TC |
Distribution
As of February, 2011Operator | Quantity | Series number | Lines serving | Note | |
---|---|---|---|---|---|
CRH380A | |||||
Shanghai Railway Bureau Shanghai Railway Bureau Shanghai Railway Bureau is a regional bureau affiliated to the Ministry of Railways of the People's Republic of China. As of 2007, the bureau is in charge of a total length of 10,810.5 kilometers, and commercial length of 4,928.1 kilometers of railways. It oversees 503 stations and manages the... |
12 | CRH380A-6001~CRH380A-6006、CRH380A-6008、CRH380A-6009、 CRH380A-6012、CRH380A-6016、CRH380A-6018、CRH380A-6021 |
Huning PDL Shanghai–Nanjing High-Speed Railway The Shanghai–Nanjing Intercity High-Speed Railway or Huning Intercity High-Speed Railway is a long high-speed rail line between Shanghai and Nanjing in the People's Republic of China. Hu and Ning are, respectively, shorthand Chinese names for Shanghai and Nanjing... 、Huhang PDL Shanghai–Hangzhou High-Speed Railway The Shanghai–Hangzhou High-Speed Railway , also known as the Huhang High-Speed Railway or Huhang Passenger Railway is a high-speed rail line in China between Shanghai and Hangzhou. The line is in length and designed for commercial train service at . It was built in 20 months and opened on October... |
||
Wuhan Railway Bureau | 16 | CRH380A-6011、CRH380A-6013~CRH380A-6015、CRH380A-6017、 CRH380A-6019、CRH380A-6020、CRH380A-6023~CRH380A-6026、 CRH380A-6028~CRH380A-6032 |
Wuguang PDL | ||
Guangzhou Railway Group Co., Ltd | 12 | CRH380A-6007、CRH380A-6010、CRH380A-6022、CRH380A-6027、 CRH380A-6033~CRH380A-6040 |
Wuguang PDL | ||
CRH380AL | |||||
Shanghai Railway Bureau Shanghai Railway Bureau Shanghai Railway Bureau is a regional bureau affiliated to the Ministry of Railways of the People's Republic of China. As of 2007, the bureau is in charge of a total length of 10,810.5 kilometers, and commercial length of 4,928.1 kilometers of railways. It oversees 503 stations and manages the... |
31 | CRH380A-6041L~CRH380A-6071L |
See also
- China Railways CRH1China Railways CRH1The CRH1 EMU is a Chinese high-speed train based on Bombardier technology and built by a Chinese-Canadian joint venture between Bombardier and Sifang at Bombardier Sifang Power Transportation factory in Qingdao, Shandong Province, People's Republic of China...
- China Railways CRH2China Railways CRH2The CRH2 is one of the high-speed train models in China. Originally, the CRH2 was a modified E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric Corporation, and Hitachi, and represents the second...
- China Railways CRH3China Railways CRH3The CRH3 is a version of the Siemens Velaro high-speed train used in China on the Beijing-Tianjin Intercity Rail line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing High-Speed Railway...
- China Railways CRH5China Railways CRH5The China Railways CRH5 is an electric multiple unit high-speed train in use with China Railway High-speed in the People's Republic of China. The CRH5 is based on the ETR-600 New Pendolino used in Italy....
- China Railways CRH6China Railways CRH6The China Railways CRH6 is a new generation of intercity high-speed train of the People's Republic of China. It is designed by CSR Qingdao Sifang Locomotive & Rolling Stock Co., Ltd. and will be manufacturer by CSR Nanjing Puzhen Rolling Stock Co...
- China Railways CIT TrainsChina railways CIT trainsChina Railways CIT trains refers to high-speed test trains that are used on the Chinese High Speed railways, CIT means Comprehensive Inspection Train...