Williams Stadium
Encyclopedia
Williams Stadium is a 19,200 seat football stadium located on the campus of Liberty University
in Lynchburg, Virginia
, USA. The stadium was built in 1989 and plays host to Liberty Flames football, which is a part of the NCAA Division I - Football Championship Subdivision (FCS). A new field house has recently been constructed at the north end of the stadium. This new facility houses a new home locker room, coaches offices, meeting rooms and training facility as well as a 16000 square feet (1,486.4 m²) weight room. In the 2009 off season, Liberty University added a video scoreboard on the north end of the field. It is one of the largest in the FCS at 20 feet tall and 36 feet wide. In September 2011, a ribbon video board was added to the facade of the upper deck; Williams Stadium thus became the first FCS football stadium to have a ribbon board.
Liberty University Chancellor Jerry Falwell, Jr. announced on August 28, 2009 a three phase addition to Williams Stadium. The plan is to increase the seating capacity of the stadium from 12,000 seats to 30,000 seats by 2015. The first phase of the construction included a five story press box and expanded the stadium by 7,200 seats. This was done by adding a second deck to the home side of the stadium and lengthening the east and west stands of the stadium. The seating capacity is currently 19,200. The estimated cost for the first phase of the project was $18 million.
The new press tower was ready for Liberty's Oct. 2, 2010 home game against Savannah State. The tower includes 18 luxury suites, all of which were sold for the 2010 season.
Phase two will add a mid deck to the student side, while phase three will complete a "horseshoe" around the south end zone, bringing the total capacity to 30,000. The estimated cost for the first phase of the project was $18 million, with the estimated total cost set at $22 million.
Liberty University
Liberty University is a private Christian university located in Lynchburg, Virginia. Liberty's annual enrollment is around 72,000 students, 12,000 of whom are residential students and 60,000+ studying through Liberty University Online...
in Lynchburg, Virginia
Lynchburg, Virginia
Lynchburg is an independent city in the Commonwealth of Virginia. The population was 75,568 as of 2010. Located in the foothills of the Blue Ridge Mountains along the banks of the James River, Lynchburg is known as the "City of Seven Hills" or "The Hill City." Lynchburg was the only major city in...
, USA. The stadium was built in 1989 and plays host to Liberty Flames football, which is a part of the NCAA Division I - Football Championship Subdivision (FCS). A new field house has recently been constructed at the north end of the stadium. This new facility houses a new home locker room, coaches offices, meeting rooms and training facility as well as a 16000 square feet (1,486.4 m²) weight room. In the 2009 off season, Liberty University added a video scoreboard on the north end of the field. It is one of the largest in the FCS at 20 feet tall and 36 feet wide. In September 2011, a ribbon video board was added to the facade of the upper deck; Williams Stadium thus became the first FCS football stadium to have a ribbon board.
Liberty University Chancellor Jerry Falwell, Jr. announced on August 28, 2009 a three phase addition to Williams Stadium. The plan is to increase the seating capacity of the stadium from 12,000 seats to 30,000 seats by 2015. The first phase of the construction included a five story press box and expanded the stadium by 7,200 seats. This was done by adding a second deck to the home side of the stadium and lengthening the east and west stands of the stadium. The seating capacity is currently 19,200. The estimated cost for the first phase of the project was $18 million.
The new press tower was ready for Liberty's Oct. 2, 2010 home game against Savannah State. The tower includes 18 luxury suites, all of which were sold for the 2010 season.
Phase two will add a mid deck to the student side, while phase three will complete a "horseshoe" around the south end zone, bringing the total capacity to 30,000. The estimated cost for the first phase of the project was $18 million, with the estimated total cost set at $22 million.