Settle Hydro is a micro hydroelectric scheme
Micro hydro
Micro hydro is a term used for hydroelectric power installations that typically produce up to 100 kW of electricity. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks....

, owned by the community, in Settle
Settle
Settle is a small market town and civil parish within the Craven district of North Yorkshire, England. It is served by the Settle railway station, which is located near the town centre, and Giggleswick railway station which is a mile away. It is from Leeds Bradford Airport...

, North Yorkshire
North Yorkshire
North Yorkshire is a non-metropolitan or shire county located in the Yorkshire and the Humber region of England, and a ceremonial county primarily in that region but partly in North East England. Created in 1974 by the Local Government Act 1972 it covers an area of , making it the largest...

.
It is located on the River Ribble
River Ribble
The River Ribble is a river that runs through North Yorkshire and Lancashire, in northern England. The river's drainage basin also includes parts of Greater Manchester around Wigan.-Geography:...

, at Settle Wier near Bridge End Mill. It uses part of the former mill race. A reverse Archimedean screw
Archimedes' screw
The Archimedes' screw, also called the Archimedean screw or screwpump, is a machine historically used for transferring water from a low-lying body of water into irrigation ditches...

 generates 50 kW of electricity.

History

Settle weir was built across the Ribble, to provide a head for the Bridge End Mill which occupies the same site. Bridge End Mill was built to mill corn, but was converted to spin cotton. Later it was fitted out to become a woodworking shop providing furniture for the local chapels out of imported cedar. Though the wheel still turns, it is not connected to any shafts, and the mill building has been converted to housing.

Planning Permission and the Abstraction Licence were granted in February 2009 and the share issue of September 2009 raised the necessary capital. The scheme is projected to cost £410,000. Lakeland Marine Construction began work on Monday 15 June. It completed in October and Settle Hydro Ltd were generating electricity by November 2009. Over the forty year lifetime of the scheme that generates 165,000 kWh per annum, it is envisaged that 3200 tonnes of carbon will be saved, although it is difficult to determine how much carbon was used in the construction of the screw and the transportation from Germany
Germany
Germany , officially the Federal Republic of Germany , is a federal parliamentary republic in Europe. The country consists of 16 states while the capital and largest city is Berlin. Germany covers an area of 357,021 km2 and has a largely temperate seasonal climate...

.

External links

The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 
x
OK