Rengali Dam
Encyclopedia
Rengali dam is located in Orissa. It is constructed across Brahmani River
Brahmani River
The Brahmani is a major seasonal river in the Orissa state of Eastern India. The Brahmani is formed by the confluence of the Sankh and South Koel rivers, and flows through the districts of Sundargarh, Kendujhar, Dhenkanal, Cuttack and Jajapur...

 in Rengali village located 70 KM from Angul
Angul
Angul may refer to:* Angul, town in India* Angul district, India...

 in Angul district
Angul District
Angul is a district of Orissa state in India. The city of Angul is the district headquarters.-History:A bridge between western and coastal areas of Orissa where the prehistoric and protohistoric relics are found in village Bhimakund, Kankili, Kulei, Samal, Sanakerjang, Kaliakata, Paranga, Kerjang,...

, Orissa
Orissa
Orissa , officially Odisha since Nov 2011, is a state of India, located on the east coast of India, by the Bay of Bengal. It is the modern name of the ancient nation of Kalinga, which was invaded by the Maurya Emperor Ashoka in 261 BC. The modern state of Orissa was established on 1 April...

 in India
India
India , officially the Republic of India , is a country in South Asia. It is the seventh-largest country by geographical area, the second-most populous country with over 1.2 billion people, and the most populous democracy in the world...

.

Construction

The dam was constructed in 1985. The project was not welcomed by the local people during the conception and initial implementation of the project due to the displacement of several people and the way the Government tacked the issue. The project has displaced a total of 10,700 families.

Features

Rengali dam is 70.5 m tall and 1040 m wide. The reservoir formed by the dam is the second largest reservoir in Orissa with 37, 840 hectares at full level and 28,000 hectares in mean level. The reservoir has a catchment area of 25,250 km2 mostly forests and wasteland. The dam is also used to generate electricity by 5 units with a capacity of 50MW each. The dam holds 3412 million cubic meters of water at Full Reservoir Level (FRL).

Rengali irrigation project

A barrage is constructed across the Brahmani river 35 KM downstream of Rengali dam. The barrage is used to store the flood releases from the dam and divert it through two canal systems. It has a free catchment area of 4780 km2 and between the dam and barrage. The area records an annual rainfall of 1570 mm on average.

Environmental impact

Bhitarkanika Mangroves
Bhitarkanika Mangroves
The Bhitarkanika Mangroves are a mangrove wetland in India's Orissa state. The Bhitarkanika Mangroves cover an area of 650 km² in the river delta of the Brahmani and Baitarani rivers.- History :...

, located in Orissa adjacent to Bay of Bengal faces a unique threat since the construction of this dam. The species of trees in the Mangroves are fed by the unique combination of salt and fresh water from rivers including Brahmani River
Brahmani River
The Brahmani is a major seasonal river in the Orissa state of Eastern India. The Brahmani is formed by the confluence of the Sankh and South Koel rivers, and flows through the districts of Sundargarh, Kendujhar, Dhenkanal, Cuttack and Jajapur...

. Scientists from Institute of Minerals and Materials Technology (IMMT) and Spatial Planning and Analysis Research Centre Private Limited (SPARC) have performed a study on Effect of reduced water flow through Brahmani-Baitarani river system on the mangrove population of Bhitarkanika estuary.

In their study, the scientists have found that the water flow at the Mangrove delta head before and after the construction of the dam in 1985 is 19,514 million cubic meters and 17,389 million cubic metres respectively. They believe that this level may go down to 14,000 once the full potential of the project will be realised around 2025. They have warned of slow decline and disappearance of the plant species in this mangroves if a sustainable amount of water is not released into the mangroves.

Performance audits

Rengali Irrigation Project has come under the scanner of India's apex audit institute twice. First, in Comptroller and Auditors General of India's report on Orissa [civil] for the year ending March 31, 2000 on Paragraph 4.1 and again on CAG's report on Orissa [civil] for the year ending March 31, 2008 on Paragraph 3.2.

In 2000, auditors had looked at non-completion of the project, non-accrual of intended benefits and widespread mismanagement in paymet to contractors particularly with reference to construction of the project up to headworks [barrage]. The report had not been discussed by Orissa State Assembly's Public Account Committee as of August 2008 [and probably till date].

In 2008, auditors noted that "due to delay in acquisition of land / nonacquisition of land, nonreceipt of forest land clearance and poor contract management, the project remained incomplete at various stages with investment of Rs 1695.61 crore (March 2008) resulting in cost over run by Rs 1461.97 crore (626 per cent) and time over run by 17 years."