Douglas Point
Encyclopedia
The Douglas Point Nuclear Generating Station was Canada’s first full-scale nuclear power plant
Nuclear power plant
A nuclear power plant is a thermal power station in which the heat source is one or more nuclear reactors. As in a conventional thermal power station the heat is used to generate steam which drives a steam turbine connected to a generator which produces electricity.Nuclear power plants are usually...

 and the second CANDU Pressurised Heavy Water Reactor.

It was built and owned by Atomic Energy of Canada Limited
Atomic Energy of Canada Limited
Atomic Energy of Canada Limited or AECL is a Canadian federal Crown corporation and Canada's largest nuclear science and technology laboratory...

 and operated by Ontario Hydro
Ontario Hydro
Ontario Hydro was the official name from 1974 of the Hydro-Electric Power Commission of Ontario which was established in 1906 by the provincial Power Commission Act to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara...

, the station was in service from 26 September 1968 to 5 May 1984. Douglas Point put Canada on the world nuclear power scene and its success was a milestone in Canadian development of nuclear power for peaceful purposes.

Decision to build

The successful Nuclear Power Demonstrator (NPD) was the first CANDU (CANada Deuterium Uranium) built. This was not a commercially economic unit and had been designed to illustrate the practicality of the CANDU system. Even before completion of the NPD, Canadian nuclear leaders were pushing for a full-scale power reactor.

In 1958, the Nuclear Power Plant Division of AECL was set up in Toronto
Toronto
Toronto is the provincial capital of Ontario and the largest city in Canada. It is located in Southern Ontario on the northwestern shore of Lake Ontario. A relatively modern city, Toronto's history dates back to the late-18th century, when its land was first purchased by the British monarchy from...

, at Ontario Hydro’s A.W. Manby Service Centre in Toronto. The decision to proceed with a 200 MWe commercial prototype reactor was formally taken in 1959. On 18 June 1959, Gordon Churchill
Gordon Churchill
Gordon Minto Churchill, PC, DSO was a Canadian politician. He served in the Legislative Assembly of Manitoba from 1946 to 1949 as an independent representative, and in the Canadian House of Commons from 1951 to 1968 as a Progressive Conservative...

, the Conservative Minister of Trade and Commerce, announced the construction of Canada’s first full-scale nuclear power station, to be located at Douglas Point.

Site selection

Choosing the site for Ontario’s first reactor designed for commercial use involved a long process of elimination. A site along the Great Lakes system was decided, and points along the shoreline north of Manitoulin Island, and from Tobermory all the way to Goderich were in the running. Over time, the future site was limited to the stretch between Goderich and Southampton. By the end of June 1959, low-lying Douglas Point, 16 km (ten miles) north of Kincardine, had attracted significant attention. The site’s solid limestone base was ideal. Hydro Electric Power Commission acquired 9.31 square kilometres (2,301 acre) of land at the site on 24 June 1959 for the cost of $50 to $70 an acre, the going price of farm land at the time.

In 1961 Douglas Point set up an information office and a Bailey bridge
Bailey bridge
The Bailey bridge is a type of portable, pre-fabricated, truss bridge. It was developed by the British during World War II for military use and saw extensive use by both British and the American military engineering units....

 at tree-top level providing a view of the site.

Construction

The Douglas Point site was cleared and excavated by Hydro construction crews sent out from Toronto, as well as by locally and provincially hired labour—a workforce numbering approximately 500. Six hundred Canadian firms, as well as manufacturers in the United Kingdom and the United States received contracts for Douglas Point. Eventually, 71% of Douglas Point’s components were supplied by Canadian manufacturers, the remainder supplied by British and American manufacturers.

Douglas Point’s heavy-water moderator was contained in a tubed vessel called the calandria
Calandria
A calandria is the reactor core of the CANDU reactor. The calandria contains heavy water, a moderator used to moderate neutrons to achieve nuclear fission....

. The stainless steel 54.4 tonne (60 ton) calandria, 6.1 metres (20 ft) in diameter, was made by Dominion Bridge in Montreal and shipped by barge to Kincardine from Lachine (on the southwest of the island of Montreal). The calandria arrived by float, and was delivered to the Douglas Point site by flat-bed truck

In May 1964, work began on transmission lines linking Douglas Point to the provincial power grid near Hanover. All the major equipment was installed by 1965.

In operation

Operators brought the Douglas Point reactor to ‘first critical’ on 15 November 1966 at 16:26 hours. On the Tuesday afternoon, engineers induced a low stage of criticality in the plant’s reactor. Criticality is a sustained reaction of atom splitting, caused by uranium fuel being placed in the 306 pressure tubes contained within the reactor.

Douglas Point’s power first entered the grid on 7 January 1967. Douglas Point was declared in-service just over a year and a half later, on 26 September 1968, with an electrical output of 220 000 kilowatts (or 220 MWe) and built at a cost of $91 million.

On-power fuelling was achieved for the first time at Douglas Point on 1 March 1970 highlighting the CANDU ability to fuel the reactor without having to shut the reactor down. On-power refuelling had been first achieved at NPD on 23 November 1963.

Originally, the site was planned to be a two-unit station. The success of four larger 542 MWe Pickering ‘A’ reactors meant that a second 220 MWe unit at Douglas Point was not constructed because it would already be regarded as too small.

Douglas Point attracted criticism in the beginning as repairs were costly in both finances and time and more than half of the time between 1968 and 1971, the generating station was ‘down.’ The system was delicate, shutting down frequently and easily. Repairs were done by remote control or large teams, as each employee could only have a limited radiation dose. Valves and pumps were difficult to reach and the system design was compact, making repair and maintenance difficult as critical components were situated in compact and inaccessible locations. This was generally due to attempts to conserve heavy water in systems. Heavy water was extremely expensive: $26 per pound, at a station which would need tons. Therefore, the design was to save every possible ounce of heavy water. The site was costly in the early stages as Douglas Point leaked extraordinary amounts of heavy water.

Douglas Point had an oil-filled window which allowed direct observation of the East reactor face, even during full-power operation.

RAPP

Douglas Point put Canada in the export field internationally, when a duplicate station at Rajasthan
Rajasthan
Rājasthān the land of Rajasthanis, , is the largest state of the Republic of India by area. It is located in the northwest of India. It encompasses most of the area of the large, inhospitable Great Indian Desert , which has an edge paralleling the Sutlej-Indus river valley along its border with...

, India
India
India , officially the Republic of India , is a country in South Asia. It is the seventh-largest country by geographical area, the second-most populous country with over 1.2 billion people, and the most populous democracy in the world...

 was committed in 1963. The Rajasthan Power Project (RAPP) included two 220 MWe CANDU reactors built in the state of Rajasthan and put into service, respectively, in 1973 and 1981. Indian tradesmen and professional engineers came to be trained at Douglas Point. After the nuclear bomb test explosion in 1973 the nuclear trade links between Canada and India were curtailed and the second RAPP reactor was completed by the Indians with no Canadian assistance.

Shutdown

On 5 May 1984 Douglas Point went offline, despite the improvement in capacity factor, from 54% at its in-service date, to 75% in 1982, and in 1984—before retirement—82%. Ontario Hydro, as agreed, had operated the plant but—highlighting the site’s challenges as an operational power reactor—refused to buy it from AECL. As Ontario Hydro was not to purchase the site, AECL would no longer finance the operation and the station was too expensive to upscale.

Station Manager Don Milley: “Yes, there is a lot of sentiment. Some people do feel emotional about it—like losing an old friend. Many people worked hard and are hard hit by it. It was a tough job to get it running well and it has been running very well.” Many employees were disappointed; others shocked, angered and betrayed. John Foster summarized: “I think you always feel something because you put so much into it …. It was the thing that the team cut their teeth on and Pickering and Bruce have benefited. But it’s only a machine, remember, and it has done its job.”

After 17 years, however, the generating station had produced valuable experience in the construction and operations of CANDU reactors and served as a teaching tool for the emerging nuclear industry. Ernie Siddall recalled: “All sorts of lessons were learned by all sorts of people. The reason Pickering ‘A’ worked so well is that the right people got their hands dirty at Douglas Point and learned the right lessons …. There were dozens of things that we learned.”

Douglas Point was home to Canada’s first medium-sized CANDU (220 MWe) reactor, as NPD was strictly a pilot project and it was Douglas Point to put Canada into the world nuclear power scene along with the United Kingdom and the United States. Douglas Point was the first designed in Canada for commercial use. Success at Douglas Point was a milestone, demonstrating in a commercial reactor the successful application of heavy water—natural uranium method and that on-power fuelling could be achieved, as well as the joint development of a major project by the joint cooperation of the federal government, a public utility and a private enterprise (Canadian General Electric, Ontario Hydro and AECL).

Douglas Point is now contained within the Bruce Power
Bruce Power
Bruce Power Limited Partnership is a Canadian business partnership composed of several corporations. It exists as a partnership between Cameco Corporation , TransCanada Corporation , BPC Generation Infrastructure Trust , the Power Workers Union and The Society of Energy Professionals...

 site, the licensed operator for Bruce Nuclear Generating Station
Bruce Nuclear Generating Station
Bruce Nuclear Generating Station is a Canadian nuclear power station located on the eastern shore of Lake Huron, in the communities of Inverhuron and Tiverton, Ontario. It occupies 932 ha of land. The facility derives its name from Bruce County in which it is located, in the former Bruce Township...

, yet the station building and remaining equipment are still owned by AECL.
The source of this article is wikipedia, the free encyclopedia.  The text of this article is licensed under the GFDL.
 