Hi
I have a brand new apartments and I applied for electric service to Meralco. The Meralco engineer/inspector told us that the location of our apartments exceeds more than 30 meters from the existing meralco pole and he said that they need to install new poles and cost will be first shoulder by the consumer (us) and will be refunded to the consumer(us)after a year. the cost is more than 50 thousand pesos for two poles. my question is ; is it really the consumer need to should first the cost of the meralco pole?
Hoping for your early response.
thank you and more power.
I have a brand new apartments and I applied for electric service to Meralco. The Meralco engineer/inspector told us that the location of our apartments exceeds more than 30 meters from the existing meralco pole and he said that they need to install new poles and cost will be first shoulder by the consumer (us) and will be refunded to the consumer(us)after a year. the cost is more than 50 thousand pesos for two poles. my question is ; is it really the consumer need to should first the cost of the meralco pole?
Hoping for your early response.
thank you and more power.