grayhound
Hello All
j4936 Kinlet Hall loco currently out of traffic its ten yearly overhaul Boiler
out of and work on this includes removal of flue tubes and a section of small
tubes. The steam tunnel has been removed to allow for repair to leaky joint and
to allow access to boiler interior The foundation ring has been re-riveted and
182 crown stays have been replaced all copper stays have been fullered and
re-shaped to remove rust from behind them work to continuing. work on the bottom half includes overhaul of motion parts and fittings.
j4936 Kinlet Hall loco currently out of traffic its ten yearly overhaul Boiler
out of and work on this includes removal of flue tubes and a section of small
tubes. The steam tunnel has been removed to allow for repair to leaky joint and
to allow access to boiler interior The foundation ring has been re-riveted and
182 crown stays have been replaced all copper stays have been fullered and
re-shaped to remove rust from behind them work to continuing. work on the bottom half includes overhaul of motion parts and fittings.