Society of Petroleum Engineers
Posts  1 - 1  of  1
samasied
1. Give a well detailed flow schematic design of an oil and gas production facility, explaining the functions of each equipment used in the production process of both oil and gas from a reservoir having a combination drive of gas and water.
(HINT: no gas flaring is allowed, provide a water treatment process and method of disposal or recycle)

2. Over the years ,the depletion of the combination reservoir above has occurred ,but production needs to be maintained at a rate of 5000 BOPD.
a. propose the most suitable artificial lift method for this condition.
b. give reasons for choosing this method.
Save
Cancel
Reply
 
x
OK